What if fuel goes up tomorrow?
Role
Product Designer, (Solo designer)
Team
Product manager, tech lead, Ironbird Logistics squad
Timeline
May 2026
Product
BBOne TMS, Ironbird Logistics (desktop, internal operations)
Cost Engine for BBOne TMS, the transport system Bluebird runs for Ironbird Logistics. Business and operations teams raise or lower a cost, such as fuel, tolls or commissions, and see what it does to standard costs, contract prices and margin before anyone commits to it.
Before a decision: impact is simulated first, approved second | 5 product questions raised before user review, answered the same day | 4 → 1 cost types that share one simulation flow |

Image 1 · Change one number, see the answer before anyone signs: fuel +400 per liter takes margin down 8.4% across every affected route.
Every cost change is a "how much?" question
Ironbird prices its trips from a handful of cost assumptions. When fuel goes up, or a toll road changes its rates, or a commission scheme is renegotiated, the question from business and operations is always the same: if we change this, how much does it move? How much do our standard costs change, how much do contract prices need to change, and what happens to margin? Until Cost Engine, there was no tool that could answer it before the decision was made.
Answering it is hard because the four cost types change in completely different shapes:
Fuel is one number per liter, applied to everything.
Tolls change either across a whole toll road, or per segment and per vehicle class.
Commissions can be implemented four different ways.
Other costs (loading, parking, and similar) need a sub-type picked before anything else.
Simulate first, decide second
So the simulation is the product, not a step before it. A planner enters the change, such as fuel from 5,800 to 6,200 per liter or the same change as a percentage, and before anything is submitted the engine shows the impact at two levels: the standard cost of every route and vehicle type, and every on-call customer contract those costs feed into. Average margin before and after sits next to the submit button, so the answer is in view at the moment of deciding.
The difference has to read in both directions. Costs go down as well as up, so the form accepts a final value below the starting one and the results show a drop as clearly as a rise. A simulation that only expects bad news would quietly mislead the people deciding.
Results are grouped by pool, route, vehicle type and cost type, so a planner can start from the total and drill down to the one route that looks wrong. Any row can be overridden, in a modal rather than an inline cell. Inline would have been faster, but a row override beats the batch value when numbers are synced. An override that strong should be deliberate and leave a mark: the row is marked as edited all the way to approval, and the change is written into the batch history.

Image 2 · The change is entered once, as a new price or a percentage, for a named batch with a validity date. Next comes the simulation, not approval.
One flow for every "what if"
The obvious answer was four tools for four cost types. I designed one flow instead, that every cost type passes through: create, simulate, approve. A batch has a name, a validity date and the pools it covers. Inside it, each cost type is a section that opens only when it is picked, with its own input shape. Fuel is a single before-and-after pair. Tolls start with a choice between a general and a per-segment change. Commissions start with the implementation type.
The price was a harder form and a harder results table, which has to stay readable whether a simulation touches one cost or four. The payoff: one place to ask any "what if", and one view of what a month's cost changes do to margin together. It showed again in Phase 2: tolls, commissions and port passes arrived as new sections of the same flow, not as new features.

Image 3 · Four cost types with four different input shapes, one shared path after that: create, simulate, approve twice.
The system can't guarantee the number, so the screen has to
The review panel described below raised the most uncomfortable question: is there anything that guarantees the number an approver signs is the number that gets synced? The answer from product was no. The approver is the guarantee.
That turned the approval screens from a yes/no step into the most information-dense part of the feature. The approver opens the same simulation the planner saw, with every hand-edited row still marked and margin before and after in the same place, and can still edit a row before approving. One tab away, the history logs every change: who made it, which contract, the old and new price, and when. The second approval does not ask "approve?". It asks whether to sync cost data as of a specific date and time, so the person clicking knows exactly what they are committing.

Image 4 · The approver opens the same simulation the planner saw: edited rows still marked, margin before and after in the same place.

Image 5 · Every level and every hand-made change leaves an entry: who, which contract, the old and new price, and the sync date for the final approval.
Six lenses, five questions nobody had asked
Before anyone else sees a flow, I stress-test it. For Cost Engine I set up a panel with an AI agent: six reviewers reading the same eight screens, each through one lens. Visual design, accessibility, copy, UX, product requirements, and a devil's advocate whose only job is to attack assumptions. Polish issues get fixed on the spot. What I am looking for is the questions.

Image 6 · Eight screens through six AI lenses. Polish was fixed on the spot; five product questions went to the users.
The devil's advocate raised five questions the product had not answered yet. I took all five to the users. They were answered the same day, and four of the answers changed the screens.

Image 7 · Five questions from the AI devil's advocate, five answers from the users, four changes on screen. The rejected-batch flow is still open.
A placeholder margin started the real conversation
The first designs showed a margin drop of 12%. In review, nobody could say where that number came from, because it was an illustrative figure, never a calculated one. Chasing it produced five product questions that had never been asked: what happens when a batch is rejected, which batch wins when validity dates overlap, whether a row edit beats the batch value, and who guarantees the synced number. Every one of them changed the screens.
What I took from it: in an operations tool, a number on a mockup is a claim. If I cannot explain it, it is a question for product, not a detail to fix later.
What is still open
The guarantee is still human. The screens make the approver's job as informed as possible, but nothing in the system checks that what was approved is what was synced. That is a product decision, and the case is honest about it rather than pretending the design closed it.









